跳到主要內容
activity Image


    期刊


    項目資料
    卷期
    Vol. & No.
    第3卷第2期

    Vol 3 No. 2
    標題
    Title
    公共工程預算執行之策略性績效衡量指標-平衡計分卡之應用

    A Study on the Strategic Performance Evaluation Measures for the Execution of Public Construction Budgets-An Application of the Balanced Scorecard
    作者
    Authors
    劉正田、林維珩、 袁玉珠
    Jenten Liu Wei-heng Lin Yuh-Ju Yuan
    出版日期
    Publish Date
    2002-11-30
    摘要
    Abstract
    公共工程是促進國家經濟繁榮及提升人民生活品質不可或缺之一環, 如何建立有效的工程績效評估作業方式,加強預算、工期及品質的控制,發 揮管考功能,圓滿達成工程計畫目標,乃是政府面臨之重要課題。本文以平 衡計分卡之觀點,透過蒐集相關文獻與專家訪談,初擬公共工程預算執行之 14 項策略目標與 42 項績效衡量指標,經由問卷研究及因素分析,建構公共 工程之策略具體行動化的整合性管理架構,共萃取「預算經費」、「品質安 保」、「控制與學習」、「執行與建議」、「預備作業」五項構面,36 項 策略績效指標。本文並針對各個構面及績效指標作變異數分析,發現如下: 公共工程考核人員較重視「預算經費」構面指標,執行人員較重視「品質安 保」、「控制與學習」及「預備作業」構面指標,年資較淺人員較重視「控 制與學習」構面指標。本研究可供政府部門連結策略目標與績效指標,以及 訂定獎懲制度之參考,有助於提昇公共工程之執行成效。

    Public construction is a major momentum to continued economic growth, and improves living standard of people. In order to improve the effective control on cost, schedule and quality, a more effective way for performance evaluation of public construction is indispensable. This study aims at the development of strategic performance measures used in the performance evaluation of public construction by adapting the system of balanced scorecard. From literature and interviews with experts, we initially develop 14 strategic targets and 42 measures for our questionnaire. The rating of these measures by people in charge of the related activities was analyzed by factor analysis. The result classifies 36 selected measures into five categories, namely, budget, construction quality and environment protection, control and learning, execution and suggestion, preparation, for use in evaluating public construction performance. Results from analysis of variance are summarized as follows: Those who evaluate public construction pay relatively more attention to budget factor. Those who execute public construction pay relatively more attention to construction quality administration and environment protection, execution and suggestion, and preparation. Those who are less experienced pay relatively more attention to control and learning. The findings of this study suggest one way to link the strategic targets and the performance and to reward accordingly by the government. Then effectiveness of public construction execution can be improved
    關鍵字
    KeyWords
    公共工程、平衡計分卡、策略目標、績效衡量

    Public construction, Balanced scorecard, Strategic targets, Performance measures
    DOI
    (全文下載
    Download)
    10.6675/JCA.2002.3.2.02
    相關文章
    Related Articles

    平衡計分卡制度建構之探討-以計畫性生產工廠為例(A Study on the Construction of the Balanced Scorecard System: The Case of a Planned Military Factory)

    以策略觀點探討新舊銀行之經營效率—結合平衡計分卡及資料包絡分析法(The Study of Relationship among EVA®, Operational Efficiency and Market Performance – An Analysis for the Electronic and Information Industries in Taiwan)

    中華郵政公司績效管理制度之研究-以平衡計分卡為架構(The Study of Chunghwa Post Company Performance Management System - A Balanced Scorecard Framework)

    採購人員獎酬制度與採購績效之關聯性(The Relationship between a Buyer Incentive Scheme and Purchasing Performance)

    機構投資人與「影子」公司治理:以歐洲企業為例(Institutional Passivity and “Shadow” Corporate Governance: European Evidence)

    實施臨床路徑對醫療資源耗用及照護品質之影響-平衡計分卡觀點(The Impact of the Clinical Pathways on Resource Consumption and the Quality of Medical Care - From the Perspective of Balanced Scorecard)